Several months after the management takeover of Port Gocek, the investors started a rehabilitation program of the facilities of Gocek Marina.
![](/media/a53ace9d-7a5d-4386-8254-7b64b1b285e3/1Jv81g/TenCate%20Water%20and%20Environment/Images/Cases/Jetties%20and%20Groynes/Port_Gocek_Turkey-01.jpg?w=16&h=9&action=crop)
Due to heavy wave action, the existing submerged breakwaters constructed from concrete precast panels were displaced, causing potential erosion damage of the sandy beaches. TenCate Geotube® systems were installed as core for groynes to replace the existing breakwaters.