The installation of TenCate Geotube® systems began at the end of end April 2006 and was completed in December of the same year. In total 18,000 metres of TenCate Geotube® systems were supplied.
TenCate Geotube® systems from TenCate Geosynthetics were selected to construct the core of the guide dams required to create a shelter for vessels to enter from the Markermeer into the Naviduct.